The best way to install Opti-Rite® 2 (and all other heavy weight commercial grade wallcoverings requiring a dry hang) is to use the double-stick method many commercial wallcovering installers use when dry hanging wallcoverings.
1) First make sure the wall is sound and sealed with a good quality acrylic wallcovering primer.
2) Apply a thin application of the heavy duty (or extra strength) clay based adhesive to the area to receive the dry erase wallcovering.
3) Allow the clay-based adhesive to flash off (this will act like a wallcovering size - of days of old wallcovering installations); under normal ambient temperatures in a HVAC controlled environment (68-72 degrees Fahrenheit) the thin application should not take long to flash off.
4) Apply another thin application of clay based adhesive and wait a few minutes (the moisture from the 2nd application will begin to flash off and wick into the first application and create a higher tack adhesive faster and more evenly than a freshly rolled on coat)
Related Products : Order Opti-Rite® 2 by the foot | Add the Semi-Permanent Adhesive | Installation Recommendations for Opti-Rite® 2 & 4-Mag
For your own protection against concealed damages, all cartons shipped by Truck should be opened and inspected upon arrival. Damages must be noted on the Bill of Lading.
Custom orders cannot be returned.
Please read our Freight Policy or contact customer service for assistance.