Specializing in Dry Erase Boards,
Whiteboards & Bulletin Boards

Bulletin Boards
Calendars Dry Erase
Chalkboards
Coaches Dry Erase Boards
Combination Boards
Conference Room Cabinets
Cork & Fabric Bulletin Board
Dry Erase Boards
Dry Erase Boards 5' Tall
Dry Erase Decals
Dry Erase Boards With Grid Lines
Dry Erase Music Staff Boards
Dry Erase Wall Coverings
Easels
Enclosed Bulletin Board
Enclosed Letter Board
Full Height Dry Erase Walls
Glass Dry Erase Boards
Horizontal Sliding Board
In / Out Boards Employee
Laminated Panels, Skins & Trays
Magnetic Accessories
Magnetic Plan Kits & Calendars
Map & Display Rails
Markers, Cleaners, Chart Tape
Music Staff Dry Erase Boards
Penmanship Manuscript Boards
Portable Dry Erase Boards
Resurfacing Options
Safety Boards
Space Divider Units
Sport Marker Boards for Coaches
Student Lap Boards
Trophy Cases
Whiteboards
Promotions & Hot Products!

Search our Site

 
Our Resources
Show Order
Privacy Policy
Contact Number & F.A.Q's
Freight Policy
Return Policy
Email
Search
Index
Shopping Cart
 
    Back Home : Dry Erase Wall Covering : Opti-Rite® Magnetic : Opti-Rite® 2 Magnetic : Installation Recommendations for Opti-Rite® 2 & 4-Mag


Click to enlarge

The best way to install Opti-Rite® 2 (and all other heavy weight commercial grade wallcoverings requiring a dry hang) is to use the double-stick method many commercial wallcovering installers use when dry hanging wallcoverings.

1) First make sure the wall is sound and sealed with a good quality acrylic wallcovering primer.

2) Apply a thin application of the heavy duty (or extra strength) clay based adhesive to the area to receive the dry erase wallcovering.

3) Allow the clay-based adhesive to flash off (this will act like a wallcovering size - of days of old wallcovering installations); under normal ambient temperatures in a HVAC controlled environment (68-72 degrees Fahrenheit) the thin application should not take long to flash off.

4) Apply another thin application of clay based adhesive and wait a few minutes (the moisture from the 2nd application will begin to flash off and wick into the first application and create a higher tack adhesive faster and more evenly than a freshly rolled on coat)

5) Follow the standard Opti-Rite® installation instructions for dry erase wall coverings.

Related Products :
Order Opti-Rite® 2 by the foot | Add the Semi-Permanent Adhesive | Installation Recommendations for Opti-Rite® 2 & 4-Mag

For your own protection against concealed damages, all cartons shipped by Truck should be opened and inspected upon arrival. Damages must be noted on the Bill of Lading.
Custom orders cannot be returned.

Please read our Freight Policy or contact customer service for assistance.



OptiMA, Inc. MyWhiteboards.Com 240 A Cherry Street Shrewsbury, MA 01545
Inside US 866-366-1500 Outside US 508-842-6200 Fax ALL 508-393-6688
 Copyright © 2011 OptiMA, Inc






Installation Recommendations for Opti-Rite® 2 & 4-Mag